Demolition of unfinished building using our machines Liebherr R936 and Komatsu PC228. Demolition included recycling of construction waste by mobile jaw crusher Finlay J-1175.
During the reconstruction of the highway D10 our company demolished an old bridge, which was in very bad shape, near the Brodce township.
Highway was closed in both directions for a short period – road closure began on Saturday 25. 6. 2016 at 14.00 and traffic was restored in the following morning 26. 6. 2016 at 8.00.
We used a wide range of machinery from demolition excavators, loaders and dump trucks to cleaning technology for final cleaning of the road.
The actual demolition of the bridge lasted 6 hours and a finished work, including all the cleaning works, was handed over against the plan with a large slack.
In the night from Wednesday to Thursday 9.6.2016 we carried bridge construction from Záboří na Labem to Hradec Králové by our Mercedes Arocs SLT + Goldhofer STZ VH8. Part of carriage was transshipment and installation realised by heavy mobile crane Liebherr LTM 1400-7.1/1.
Proportion of unit
Length – 36m
Width – 6,5m
Height – 4m
Weight – 111,2t
Proportion of bridge construction
Length – 24,7m
Width – 6,5m
Height – 4m
Weight – 64t
Demolition of old boiler in industrial area Kladno by Caterpillar 5080 – our biggest demolisher.
The technology of demolition using hydraulic shears provides for maximum safety when removing buildings and thanks to the low level of vibrations and noise, it is also considerate to the surroundings of the demolition place and the environment.
Preparation of the construction site in the old industrial premises for apartment buildings comprise demolition and earthworks, recycling of construction waste and removal of soil