Transport and then installation of a bridge construction

During the night from 17. 8. to 18. 8. 2015, we used our technologies for transporting a bridge construction 6 metres wide. Because of the large size of the construction, the transport was assisted not only by our support vehicles, but also by the vehicles of Czech Police. The following day the construction was placed by one of our track cranes.

 

Provozovna a sídlo společnosti

Pavel Švestka, s. r. o.
U Zastávky 182
252 16 Nučice u Rudné