Demolition of the 88-meter bridge over the river
Another demolition in full swing
Last week we started demolishing the bridge in Kamenný Přívoz. With our crawler Liebherr R 946, we are gradually dismantling the old reinforced concrete bridge structure directly from the bed of the Sázava River. The total length of the structure is 88 meters.
Take a look at the photos from the event with us





