Demolition of a bridge in Jablonec nad Jizerou

A bridge over the Jizera River was demolished in Jablonec nad Jizerou. The total length of the bridge was 37 meters and we used Liebherr R 946 NLC and R 926 COMPACT crawler excavators to demolish it.

Check out the pictures from the event

 

Provozovna a sídlo společnosti

Pavel Švestka, s. r. o.
U Zastávky 182
252 16 Nučice u Rudné